Update patch set 9
Patch Set 9: Verified-1 Build failed (check pipeline). For information on how to proceed, see http://docs.openstack.org/infra/manual/developers.html#automated-testing - stestr-list http://logs.openstack.org/96/657396/9/check/stestr-list/39a6860/ : FAILURE in 2m 25s Patch-set: 9 Label: Verified=-1
This commit is contained in:
parent
c5ec890245
commit
c9ab470e61